Leaks, mold, and cracked grout signal bigger issues under the surface. A full remodel pulls the problem out at the root. At MHI Renovation Services, we handle the full scope from planning through final cleanup. Calls get answered. Estimates are written. Work starts on the date we agree to.

If you need bathroom remodeling contractors yonkers ny with clear pricing and a crew that respects your home, call (914) 656-0885 or request a free quote online.

What Our Bathroom Remodeling Service Includes

Every project is scoped to the home, not a template. These are the core line items we handle on most jobs.

Have a scope outside this list? Call us. We likely still handle it, or we know a trusted trade partner who does. See our full services overview for more.

How Our Process Works

  1. Demolition and rough-in — Crews protect floors, demo cleanly, and complete framing, plumbing, and electrical rough-in.
  2. Inspections — Local building inspectors sign off on rough-in before walls close up.
  3. Finish work — Tile, cabinets, flooring, trim, and paint go in with daily site cleanup.
  4. Final walkthrough — We walk the project together, build a punch list, and close out every item.
  5. Free consultation — We meet at your home, measure the space, and listen to how the room should work.

Why Homeowners Hire MHI Renovation Services

Read recent client reviews or browse our project gallery to see finished work.

Materials, Selections, and What to Expect

Tile size changes how a small bath reads. Large-format 12×24 tiles with minimal grout lines make a room feel bigger. Mosaic accents on floors or niches break up the scale without shrinking the space.

We walk every homeowner through product options during the estimate visit. You pick the look. We confirm it fits the budget and the space. No pressure, no upsell theater. Browse finished projects in our gallery for reference.

Service Area

Working in Yonkers means knowing the permit office on South Broadway, the inspection schedule, and which side streets take a dumpster without a permit issue. Learn more about our team and how we work.

Project Timeline and Budget

Simple cosmetic baths — vanity, toilet, paint, new floor — finish in one to two weeks and start around $8,000. Full gut remodels with custom tile and new plumbing runs take four to six weeks and land between $20,000 and $45,000.

We publish a written schedule on day one and update it weekly. Budgets lock in with a signed contract and material allowances broken out line by line. You know where every dollar goes before demo starts.

Frequently Asked Questions

Do you handle the plumbing permit?

Yes. Licensed plumbers pull the permits, and we coordinate all inspections.

How long does a bathroom remodel take?

A full bath remodel usually runs three to five weeks. Tub-to-shower conversions and cosmetic updates can finish in one to two weeks.

Can we use the bathroom during the work?

Not during active demo and tile work. We schedule around at least one other working bathroom in the home, or we sequence the work to minimize downtime.

Start Your Project

Call (914) 656-0885 or use the online form to book a free on-site consultation. You get a written quote within 48 hours. You can also visit our contact page or related services.

MHI Renovation Services
48 Edgewood Ave, Yonkers, NY 10704
Phone: (914) 656-0885
Email: [email protected]
Reviewed by Mike, Owner and Project Manager at MHI Renovation Services. Page published April 2026.